Controlled water, stable ground
Every site has water. The difference is whether it’s managed or ignored. Westforce delivers drainage infrastructure that protects the integrity of every build, from formation to finish. This means runoff is controlled, foundations stay dry, and future scopes aren’t disrupted by the past.
Subsurface pipework, culverts, open channels and stormwater retention systems are planned with intent and installed to spec. We work with hydrology, topography and sequencing to avoid rework, reduce disruption and deliver a stable platform for every scope that follows.
Ask us about drainage integration
Constructed to support the whole
Drainage doesn’t happen in isolation. It intersects with road alignments, structure pads, and service corridors. Our teams work across disciplines to make sure every element lands in the right place, at the right time, without holding others up.
That means verifying set-out, coordinating timing with civil works, and sequencing each section to minimise backtracking or clashes. Installations are compacted in layers, levels are checked as we go, and materials are handled with care to ensure long-term durability.
Owning the commitment
Drainage only works if everything around it supports the system. That includes everything from grading and erosion control to surface finishes and environmental controls. Westforce takes full ownership of those requirements. Stormwater diversion, runoff containment and sediment protection are planned in, not patched on.
Whether the job involves culverts under haul roads, open swales across laydown zones, or integrated stormwater management through an entire plant site, we make sure it functions as intended. We align with environmental approvals, verify handover data, and deliver a finished scope the client can depend on.
Compliance is tracked. Handover requirements are built into delivery. The finished system aligns with approvals and performs without issue. That’s not just good construction. That’s risk, removed before it surfaces.
Clear, honest communication
Clients trust us to get it right the first time. That means clear coordination, high standards, and no surprises at handover. Every pit, pipe and culvert is built with care, and checked with the same intent.
Our crews are experienced, accountable and easy to deal with on site. They know the specs, respect the program, and work to keep things simple. That’s how we deliver drainage infrastructure that holds up over time, and why we’re trusted to keep doing it.