Battery Energy Storage (BESS) Civil Works in WA

Westforce Constructions is a Western Australian civil contractor for battery energy storage systems (BESS), wind, solar and renewable energy infrastructure. Part of the Raubex group, with more than 320 people across WA, we self-perform the earthworks, equipment slabs, trenching, drainage and craneage that a BESS site needs, built around exact battery placement and the electrical interface. BESS projects move fast and the grid-connection date does not move, so we show up early, stay present and perform under pressure.

Site preparation, foundations and equipment slabs

The batteries, power conversion systems and transformers only sit right if the civil works underneath them are right. We deliver the bulk earthworks, hardstands, equipment slabs and plinths to the setout and level tolerances the OEM specifies, so the enclosures land clean and installation is not held up. Because we self-perform this work, we control the quality and the sequence rather than passing it down a chain.

Cable trenching, earthing and electrical interface

A BESS site lives or dies on its electrical interface. We install the cable trenching, conduit and pit networks that connect the units to each other and to the point of connection, along with the earthing grid, and we build it around the electrical design rather than in spite of it. We coordinate early and directly with the electrical contractor and OEM so the underground services are proven and covered before installation starts.

Fire separation, bunding and site compliance

Battery storage carries fire and safety requirements that ordinary civil sites do not. We build to the fire separation, spacing, hardstand and bunding requirements set by the OEM and the relevant Australian Standards and WA authority guidance, and we embed QA, safety and environmental controls into every part of the scope. We know what a compliant BESS site needs, and we build it that way the first time.

Grid connection and switchyard civil works

A battery is only an asset once it is connected. We deliver the civil scope at the connection point, from the switchyard and substation works through to the conduits, foundations and earthing that tie the site into the network. We delivered the civil works for the 132kV switchyard at the Alkimos Seawater Desalination Plant, and we bring that same power-adjacent experience to BESS grid connections. See our Electricity Network Infrastructure work for more.

One accountable structure, delivered on program

BESS projects move fast and scope changes are common. Westforce self-performs the core civil works and manages the subcontractors around them, so you get one point of accountability instead of a gap between packages. We work alongside principal contractors, engineers and OEM providers to make the site ready and keep it that way, solving problems early through direct communication and site-based leadership, as we did decommissioning Neoen’s DeGrussa solar and battery project in the Goldfields. When the clock is ticking towards energisation, we keep it simple and we keep our word.

Frequently Asked Questions

Can you build the equipment slabs and foundations to our OEM’s tolerances?

Yes. We build the equipment slabs, plinths and foundations to the setout and level tolerances the OEM specifies for the battery enclosures, power conversion systems and transformers. We self-perform this work, so we hold the tolerances ourselves rather than relying on a subcontractor, and we prove them before the equipment is delivered.

Can you hit our grid-connection and energisation date?

Program certainty is the reason clients bring us onto BESS projects. We plan the civil works around your energisation milestone, self-perform the critical-path scope so it does not sit behind another contractor, and flag risks early rather than at the deadline. If we commit to a date, we build the sequence to protect it.

Do you understand BESS fire separation, spacing and bunding requirements?

We do. We build to the fire separation, spacing, hardstand and bunding requirements set by the OEM and the relevant Australian Standards and WA authority guidance, and we plan drainage and containment into the site from the start. It is one of the things that separates a BESS-ready civil contractor from a general one.

Will you work as the civil package contractor under our EPC or OEM?

Yes. That is our usual structure on BESS projects. We work as the self-performing civil contractor under the principal contractor, EPC or OEM, take clear ownership of the civil scope, and can extend into design and construct where needed.

Can you provide the hardstand, laydown and craneage for battery delivery and installation?

Yes. We build the hardstands and access roads for heavy deliveries, set up laydown and crane pads to suit the lift plan, and provide craneage and heavy lifting for offloading and placing the units. The civil and the lift are planned together so delivery day runs without improvisation.

Do you deliver BESS civil works on regional and remote sites across WA?

Yes. We deliver BESS and renewable energy civil works on projects across Perth and regional Western Australia, including remote sites. We mobilise the right crews, plant and supervision to where the project is, and we understand what regional logistics and weather do to a construction program.