Project Overview

Westforce was engaged by MSP Engineering to deliver a comprehensive package of civil and services works for the new Lithium Hydroxide Plant in Kwinana, the first facility of its kind outside China and the largest in the world.

The scope encompassed earthworks, pavement construction, drainage installation, and the delivery of multiple concrete structures. Westforce also installed extensive buried services, including gas lines, firewater, sewer, potable and recycled water systems.

Westforce was also responsible for building the 132kv substation and completing various service installations, notably gas mains, firewater, and HV cables.

  • Road works: Construction of hardstands and road pavements, including preparation, base installation, and asphalt trimming
  • Drainage: Stormwater drainage systems with swales and overflow structures
  • Concrete: Ground slabs, retaining walls, pedestals, ring beams, suspended slab, and other concrete foundations
  • Fencing and lighting: Security fencing, gates, and lighting mast foundations around site perimeter
  • Buried services: Gas mains, potable water, sewer, wastewater, firewater, and recycled water systems

Concrete: 1,100m³ ~
Roadworks: 73,000m² ~
Buried Services: DN150mm steel gas main, 300m ~

Location

Value

$15M – $20M ~

Client

MSP Engineering

Completion Year

2019
Project Overview

Westforce was engaged by MSP Engineering to deliver a comprehensive package of civil and services works for the new Lithium Hydroxide Plant in Kwinana, the first facility of its kind outside China and the largest in the world.

The scope encompassed earthworks, pavement construction, drainage installation, and the delivery of multiple concrete structures. Westforce also installed extensive buried services, including gas lines, firewater, sewer, potable and recycled water systems.

Westforce was also responsible for building the 132kv substation and completing various service installations, notably gas mains, firewater, and HV cables.

  • Road works: Construction of hardstands and road pavements, including preparation, base installation, and asphalt trimming
  • Drainage: Stormwater drainage systems with swales and overflow structures
  • Concrete: Ground slabs, retaining walls, pedestals, ring beams, suspended slab, and other concrete foundations
  • Fencing and lighting: Security fencing, gates, and lighting mast foundations around site perimeter
  • Buried services: Gas mains, potable water, sewer, wastewater, firewater, and recycled water systems

Concrete: 1,100m³ ~
Roadworks: 73,000m² ~
Buried Services: DN150mm steel gas main, 300m ~