Pilgangoora P1000 Processing Facility Expansion

Location

Value

$25M – $30M ~

Client

Pilbara Minerals

Completion Year

2025
Project Overview

Westforce was engaged to deliver the Bulk Earthworks package for the P1000 Expansion Project at the Pilgangoora Processing Facility.

Following the successful start of works, our team was awarded additional scopes covering brownfields concrete, ROM backfill and gas infrastructure, reflecting client confidence in our on-ground delivery.

The P1000 Expansion will boost Pilbara Minerals’ lithium spodumene concentrate production capacity by 47%, taking the nameplate output to 1M tonnes per year.

Bulk Earthworks Package

  • Establish and produce from borrow pits
  • Construct 4m-high berms
  • Build 2 turkey nests with HDPE liners and associated pipework (welded, bolted, pressure tested)
  • Develop and manage TMPs with road diversions
  • Install culverts and headwalls with stabilised sand backfill
  • Locate and relocate underground services

Brownfields Concrete and Primary Crusher Packages

  • Detailed and bulk earthworks
  • In-situ concrete works to footings, pedestals, plinths, and slabs
  • Install bump stops and slabs

Brownfields Gas Main Package

  • Trenching and HDPE pipe installation (50mm and 250mm)
  • Isolation and tie-in works
  • Commissioning

Topsoil Stripping, Clearing and Grubbing: 100,000m² ~
Foundation Preparation: 140,000m² ~
Bulk Earthworks: 171,000m³ ~
Borrow Pit Material Development: 25,000m³ ~
Pavements and Pads: 77,000m² ~
Concrete Volume: 1,000m³ ~
Rock Berm Construction: 9,000m³ ~
2x Turkey Nest Area with HDPE Liner: 19,000m² ~

Location

Value

$25M – $30M ~

Client

Pilbara Minerals

Completion Year

2025
Project Overview

Westforce was engaged to deliver the Bulk Earthworks package for the P1000 Expansion Project at the Pilgangoora Processing Facility.

Following the successful start of works, our team was awarded additional scopes covering brownfields concrete, ROM backfill and gas infrastructure, reflecting client confidence in our on-ground delivery.

The P1000 Expansion will boost Pilbara Minerals’ lithium spodumene concentrate production capacity by 47%, taking the nameplate output to 1M tonnes per year.

Bulk Earthworks Package

  • Establish and produce from borrow pits
  • Construct 4m-high berms
  • Build 2 turkey nests with HDPE liners and associated pipework (welded, bolted, pressure tested)
  • Develop and manage TMPs with road diversions
  • Install culverts and headwalls with stabilised sand backfill
  • Locate and relocate underground services

Brownfields Concrete and Primary Crusher Packages

  • Detailed and bulk earthworks
  • In-situ concrete works to footings, pedestals, plinths, and slabs
  • Install bump stops and slabs

Brownfields Gas Main Package

  • Trenching and HDPE pipe installation (50mm and 250mm)
  • Isolation and tie-in works
  • Commissioning

Topsoil Stripping, Clearing and Grubbing: 100,000m² ~
Foundation Preparation: 140,000m² ~
Bulk Earthworks: 171,000m³ ~
Borrow Pit Material Development: 25,000m³ ~
Pavements and Pads: 77,000m² ~
Concrete Volume: 1,000m³ ~
Rock Berm Construction: 9,000m³ ~
2x Turkey Nest Area with HDPE Liner: 19,000m² ~

Request Our Capability Statement

Name(Required)

Contact Us

Name(Required)

Careers

Express Your Interest

Name(Required)
Max. file size: 100 MB.
Max. file size: 100 MB.