Pilgangoora Processing Facility Expansion (Midstream)

Location

Value

$5M – $10M ~

Client

Pilbara Minerals

Completion Year

2025
Project Overview

As part of Pilbara Minerals’ growth in the lithium sector, Westforce delivered the Midstream Concrete and Detailed Earthworks package for the joint venture between Pilbara Minerals and Calix. Located at the Pilgangoora Lithium Mine near Marble Bar, the project supported the development of an innovative midstream lithium processing plant designed to enhance product value on site.

Working within the constraints of an active mining environment, Westforce applied detailed planning, consistent delivery and disciplined execution to maintain program momentum.

  • Bulk and detailed earthworks, including deep excavations up to 3m
  • Construction of embankments and erosion control structures
  • Blinding and reinforced structural concrete, including 3.5 metre high walls
  • Single shift foundation pour of approximately 550m³
  • Temporary works design and installation
  • Installation of HV conduit, earthing systems and rods
  • Supply, installation and pressure testing of HDPE pipe and hydrant fittings

Concrete: 2,600m³ ~
Bulk Earthworks: 5,600m³ ~
Reinforcement: 320T ~
Single Shift Foundation Pour: 550m³ ~

Location

Value

$5M – $10M ~

Client

Pilbara Minerals

Completion Year

2025
Project Overview

As part of Pilbara Minerals’ growth in the lithium sector, Westforce delivered the Midstream Concrete and Detailed Earthworks package for the joint venture between Pilbara Minerals and Calix. Located at the Pilgangoora Lithium Mine near Marble Bar, the project supported the development of an innovative midstream lithium processing plant designed to enhance product value on site.

Working within the constraints of an active mining environment, Westforce applied detailed planning, consistent delivery and disciplined execution to maintain program momentum.

  • Bulk and detailed earthworks, including deep excavations up to 3m
  • Construction of embankments and erosion control structures
  • Blinding and reinforced structural concrete, including 3.5 metre high walls
  • Single shift foundation pour of approximately 550m³
  • Temporary works design and installation
  • Installation of HV conduit, earthing systems and rods
  • Supply, installation and pressure testing of HDPE pipe and hydrant fittings

Concrete: 2,600m³ ~
Bulk Earthworks: 5,600m³ ~
Reinforcement: 320T ~
Single Shift Foundation Pour: 550m³ ~

Request Our Capability Statement

Name(Required)

Contact Us

Name(Required)

Careers

Express Your Interest

Name(Required)
Max. file size: 100 MB.
Max. file size: 100 MB.