NPI Mobile Maintenance and Associated Works Iron Bridge

Location

Marble Bar, WA

Value

($10M-$20M)~

Client

Fortescue Metals Group (FMG)

Completion Year

2023
Project Overview

The project involves the construction of new NPI infrastructure, for FMG at their Iron Bridge Mine site. Including but not limited to, HV Tyre Change Warehouse; General Warehouse; HV Workshop; HV Washdown Bay with a HV drive in sump & hydrocarbon storage; Welding Workshop; Bulk Fuel Farm, Bulk Lube Bay; Drilling and Blast Workshop concrete, steel structure and dome; Switchroom footings, sheet piles installation at Wet Plant; and Japal Village concrete works.

To complete all 5 structures, Washdown, Fuel Farm, Lube Farm and the other the scope will include, earthworks, concrete, structural steel, domes, containers, electrical, tanks and pipework installation, mechanical and office fit out.

Concrete: 2,500m3
Earthworks: 15,000m3

Contact Us

Name(Required)

Careers

Express Your Interest

Name(Required)
Max. file size: 100 MB.
Max. file size: 100 MB.

Enquire Now

Name(Required)