Project Overview

As part of BHP’s broader program to expand mining, processing, and outload capacity at the Mining Area C Iron Ore hub, Westforce was engaged to deliver critical communications infrastructure.

This package played a key role in enhancing operational connectivity and reliability across the South Flank development, ensuring seamless communication networks to support the expanded mining operations in this remote Pilbara location.

Our scope included the installation of 12 remote communication towers, associated switch rooms, and integrated solar farms, supported by the construction of access tracks connecting these facilities to the main haul and service roads.
Works included:

  • Grading and maintenance of haul roads
  • Civil works and concrete foundations
  • Construction of tower foundations and solar panel foundations
  • Rock excavation and installation of rock anchors
  • Construction of raft slabs for communication towers
  • Roadworks using borrow material with circa 5-10km haul distance
  • Switchyard surfacing with blue metal
  • Trenching for electrical conduits and earth grid, generally in rock

Concrete: 2,000m³ ~
Reinforcement: 250T ~
Trenching: 3,400m ~
Bulk Earthworks: 8,000m³ ~

Location

Value

$5M – $10M ~

Client

Downer

Completion Year

2020
Project Overview

As part of BHP’s broader program to expand mining, processing, and outload capacity at the Mining Area C Iron Ore hub, Westforce was engaged to deliver critical communications infrastructure.

This package played a key role in enhancing operational connectivity and reliability across the South Flank development, ensuring seamless communication networks to support the expanded mining operations in this remote Pilbara location.

Our scope included the installation of 12 remote communication towers, associated switch rooms, and integrated solar farms, supported by the construction of access tracks connecting these facilities to the main haul and service roads.
Works included:

  • Grading and maintenance of haul roads
  • Civil works and concrete foundations
  • Construction of tower foundations and solar panel foundations
  • Rock excavation and installation of rock anchors
  • Construction of raft slabs for communication towers
  • Roadworks using borrow material with circa 5-10km haul distance
  • Switchyard surfacing with blue metal
  • Trenching for electrical conduits and earth grid, generally in rock

Concrete: 2,000m³ ~
Reinforcement: 250T ~
Trenching: 3,400m ~
Bulk Earthworks: 8,000m³ ~

Request Our Capability Statement

Name(Required)

Contact Us

Name(Required)

Careers

Express Your Interest

Name(Required)
Max. file size: 100 MB.
Max. file size: 100 MB.

Enquire Now

Name(Required)