Project Overview

The BHP Jimblebar Surplus Water dewatering project consisted of the construction of dewatering infrastructure at the Jimblebar Iron Ore Mine in the Pilbara region to remove existing water from an exploration area, enabling BHP to commence mining operations.

Westforce delivered all civil works required for the project, including modifications to the existing WH5/6 storage facility, installation of a new HASHI storage facility, two water transfer pipelines, and three reinjection Managed Aquifer Recharge (MAR) bores.

  • Site clearing, grubbing and topsoil removal
  • Bulk earthworks and access track construction (cut and fill)
  • Trenching for 30km of 600-800mm diameter pipeline
  • Installation of HPDE lining to existing turkeys nest
  • Construction of new HASHI turkeys nest
  • Pipeline installation and commissioning
  • Conduit installation
  • Building pad construction
  • Concrete structures
  • Reinjection bore infrastructure

A wide variety of works was completed across several locations.

Trenching: 30km ~
Pipeline: 30km DN600-800
Concrete: 1,100m³ ~
Bulk Earthworks: 20,000m³ ~
HASHI Turkeys Nest: 10,500m² ~

Location

Value

$15M – $20M ~

Client

Monadelphous

Completion Year

2022
Project Overview

The BHP Jimblebar Surplus Water dewatering project consisted of the construction of dewatering infrastructure at the Jimblebar Iron Ore Mine in the Pilbara region to remove existing water from an exploration area, enabling BHP to commence mining operations.

Westforce delivered all civil works required for the project, including modifications to the existing WH5/6 storage facility, installation of a new HASHI storage facility, two water transfer pipelines, and three reinjection Managed Aquifer Recharge (MAR) bores.

  • Site clearing, grubbing and topsoil removal
  • Bulk earthworks and access track construction (cut and fill)
  • Trenching for 30km of 600-800mm diameter pipeline
  • Installation of HPDE lining to existing turkeys nest
  • Construction of new HASHI turkeys nest
  • Pipeline installation and commissioning
  • Conduit installation
  • Building pad construction
  • Concrete structures
  • Reinjection bore infrastructure

A wide variety of works was completed across several locations.

Trenching: 30km ~
Pipeline: 30km DN600-800
Concrete: 1,100m³ ~
Bulk Earthworks: 20,000m³ ~
HASHI Turkeys Nest: 10,500m² ~

Request Our Capability Statement

Name(Required)

Contact Us

Name(Required)

Careers

Express Your Interest

Name(Required)
Max. file size: 100 MB.
Max. file size: 100 MB.

Enquire Now

Name(Required)