The Flying Fish iron ore deposit is located 35km east of the Eliwana mine, within the Western Hub development. The ore will be road trained to the existing Eliwana Ore Processing Facility (OPF) for processing and blending.
Westforce was engaged by FMG to remove culverts and install CSP at six locations along a HV road, as well as install CSP culverts at six locations along a LV road.
Bulk Earthworks: 9600m³ ~
Culverts: 900 dia x 208m , 1200 dia x 474m , 3000 dia x 840m
Rock Protection: 1760m² ~
Location
Value
Client
Completion Year
The Flying Fish iron ore deposit is located 35km east of the Eliwana mine, within the Western Hub development. The ore will be road trained to the existing Eliwana Ore Processing Facility (OPF) for processing and blending.
Westforce was engaged by FMG to remove culverts and install CSP at six locations along a HV road, as well as install CSP culverts at six locations along a LV road.
Bulk Earthworks: 9600m³ ~
Culverts: 900 dia x 208m , 1200 dia x 474m , 3000 dia x 840m
Rock Protection: 1760m² ~