Project Overview

The Alcoa Residue Filtration Building Stage 2 was a major infrastructure upgrade at Alcoa’s Pinjarra Alumina Refinery, delivered to increase processing capacity for converting bauxite residue into a stable, low-moisture filter cake. The project involved the delivery of new SMP, E&I and civil infrastructure to improve water recovery, reduce the residue storage footprint, and enhance overall operational efficiency, supporting Alcoa’s long-term environmental and sustainability objectives.

Engaged by SIMPEC, Westforce successfully delivered the Concrete and Detailed Earthworks package, providing critical civil infrastructure across multiple process, structural and electrical facilities within the residue filtration plant expansion.

  • Delivery of the concrete and detailed earthworks package across seven operational work zones within the Alcoa Residue Filtration Building Stage 2 expansion.
  • Construction of reinforced concrete foundations, slabs, footings, pedestals, retaining walls, ring beams, drainage infrastructure and associated civil structures for the filtration building, tank farm, switchroom, transformer station and conveyor facilities.
  • Installation of underground electrical service infrastructure, including conduits, cable pits, trenching and backfilling.
  • Installation of cast-in items, anchor bolts, bollards, handrails and safety barriers.
  • Detailed earthworks, excavation, structural backfilling, compaction and site reinstatement works.

Concrete: 4,900m3 ~

Bulk Earthworks: 3,200m3 ~

Detailed Earthworks: 7,200m3 ~

Imported Fill: 3,000m3 ~

Trenching: 520m²

Conduits: 1,850L/M ~

Reinforcement: 690T ~

Fencing: 60m ~

Location

Pinjarra

Value

$15M – $20M

Client

Simpec

Completion Year

2026
Project Overview

The Alcoa Residue Filtration Building Stage 2 was a major infrastructure upgrade at Alcoa’s Pinjarra Alumina Refinery, delivered to increase processing capacity for converting bauxite residue into a stable, low-moisture filter cake. The project involved the delivery of new SMP, E&I and civil infrastructure to improve water recovery, reduce the residue storage footprint, and enhance overall operational efficiency, supporting Alcoa’s long-term environmental and sustainability objectives.

Engaged by SIMPEC, Westforce successfully delivered the Concrete and Detailed Earthworks package, providing critical civil infrastructure across multiple process, structural and electrical facilities within the residue filtration plant expansion.

  • Delivery of the concrete and detailed earthworks package across seven operational work zones within the Alcoa Residue Filtration Building Stage 2 expansion.
  • Construction of reinforced concrete foundations, slabs, footings, pedestals, retaining walls, ring beams, drainage infrastructure and associated civil structures for the filtration building, tank farm, switchroom, transformer station and conveyor facilities.
  • Installation of underground electrical service infrastructure, including conduits, cable pits, trenching and backfilling.
  • Installation of cast-in items, anchor bolts, bollards, handrails and safety barriers.
  • Detailed earthworks, excavation, structural backfilling, compaction and site reinstatement works.

Concrete: 4,900m3 ~

Bulk Earthworks: 3,200m3 ~

Detailed Earthworks: 7,200m3 ~

Imported Fill: 3,000m3 ~

Trenching: 520m²

Conduits: 1,850L/M ~

Reinforcement: 690T ~

Fencing: 60m ~

Request Our Capability Statement

Name(Required)

Contact Us

Name(Required)

Careers

Express Your Interest

Name(Required)
Max. file size: 30 MB.
Max. file size: 30 MB.