Location Value Client
Newman, WA $2.5M ~ Eastern Guruma

START: 2021 - FINISH: 2022


PROJECT OVERVIEW

The project involves the installation of various concrete pads around the rail loop area of the South Flank mine including the following:

Bunded concrete slabs of various shapes and sizes which are enclosed by removable chained bollards
The installation of concrete slabs form maintenance works along a length of 14km of the existing conveyor belt
The installation of footings to support sea containers
The installation of rip rap pads at various area around the rail loop

PROJECT SCOPE

Westforce scope included detailed earthworks and the installation of conduits, concrete, bollards and rip rap.

PROJECT STATS

Concrete: 745m3
Detailed Earthworks: 650m3
Bollards: 80 qty
Rip Rap: 200m3