Location | Value | Client |
Pilbara, WA | $5M ~ | Simpec |
The Pilgangoora mine site is a lithium plant owned and operated by Pilbara Minerals.
As part of this project Westforce were required to complete all civil and structural works associated with the Spodumene Fileter 2 building, The Spodumene Filter 2 Feed Area, the Spodume Cloth Wash tank, the Coarse Spodumene Storage Slab, Compressor Shed, 23500 Pre-flotation civil works and the 22200 HMS Bypass Valve platform.