Location | Value | Client |
Newman, WA | $10M ~ | Roy Hill Iron Ore |
The ROM 4 Project is a 40.5Mtpa facility that is anticipated to deliver first ore by January 2023, and to be in service until 2032.
Detailed Earthworks - Foundation preparation, loading, hauling, placement, and compaction of material
Concrete - Supply and installation of reinforced concrete for conveyor CVR523, Crushing Station 5, Transformers, switchrooms & drive-in sumps
Earthing – Installation & testing of earth grids, electrodes, and bonds
Miscellaneous - Light pole footings, grouting, concrete stair pads, and installation of bollards
Concrete works in further detail included:
Footings, slabs, walls, plinths & pedestal, precast panels, reinforcing steel, blinding, formwork, construction joints, hold down bolts, grouting, and all embedded items.
Concrete: 2,600m3
Steel Reinforcement: 370 Tons