Location Value Client
Newman, WA $15M ~ Monadelphous

START: 2020 - FINISH: 2022


PROJECT OVERVIEW

The BHP Jimblebar-SWP1 dewatering project consistede of the construction of the Dewatering Infrastructure at the Jimblebar Iron Ore Mine Site to remove existing water from an exploration area of the mine so BHP could commence mining.

Westforce were contracted to do the civil works required to complete the works at the existing WH5/6 Turkey's nest, the installation of a new HASHI turkey's nest, the installation of two pipelines and the 3 reinjection MAR bores.

PROJECT SCOPE

Tree removal & topsoil
Bulk earthworks
Clearing & grubbing
Turkeys nest
Installation of building pads
Trenching
Pipeline
Conduits
Concrete structures
Access track cut & fill
Miscellaneous items

Wide variety of works over several locations.

PROJECT SCOPE

Concrete: 1,100m3
Bulk Earthworks: 20,000m3
Trenching: 30km