Location | Value | Client |
Marble Bar, WA | $13M ~ | Fortescue Metals Group |
START: 2021 - FINISH: 2022
PROJECT OVERVIEW
The project involves the construction of new NPI infrastructure, for FMG at their Iron Bridge Mine site. Including but not limited to, HV Tyre Change Warehouse; General Warehouse; HV Workshop; HV Washdown Bay with a HV drive in sump & hydrocarbon storage; Welding Workshop; Bulk Fuel Farm, Bulk Lube Bay; Drilling and Blast Workshop concrete, steel structure and dome; Switchroom footings, sheet piles installation at Wet Plant; and Japal Village concrete works.
PROJECT SCOPE
To complete all 5 structures, Washdown, Fuel Farm, Lube Farm and the other the scope will include, earthworks, concrete, structural steel, domes, containers, electrical, tanks and pipework installation, mechanical and office fit out.
PROJECT STATS
Concrete: 2,500m3
Earthworks: 15,000m3